We firmly believe success depends on details. In order to ensure our excellent quality, beside professional talent, advanced technology, we also has 3 person responsibilities for quality Inspection. Our production line has 3 times quality check. Fist time is before production check, which for the raw materials’ thickness and quality. Second time is middle production check, which for the welding, derusting and the size. Third time is after production check, which for the painting and the package.
We believe that the perfect quality is our pride, what push us move forward greatly is more and more customers’ reorganization and flowing. Establish and protect our own brand is we always seek.
Wind resistance | Grade 11(wind speed≤120 km/h) | |
---|---|---|
Earthquake resistance | Grade 7 | |
Snow load capacity of roofing | 0.6 kn/m² | |
Live load capacity of roofing | 0.6 kn/m² | |
External and internal wall heat transmission coefficient | 0.35 kcal/m²hc | |
Wall permitted loading | 0.6 kn/m² | |
Density of EPS | 12 kg/m² | |
Delivery time | Normally 20-25 days | |
Container loading | 300-320 m² /HQ |
Contact: Siwen Chen
Tel: +86 13902808995
E-mail: siwenchen@chinawellcamp.com
Address: Unit 804, 8th Floor, Block A, 115 Jihua 4th Road, Chancheng District, Foshan City, Guangdong Province, China
Factory Address: No.7 Wende 4th street,Dawang High -Tech Zone, Zhaoqing, Guangdong, China