Construction process and precautions of container office

by:WELLCAMP, WELLCAMP prefab house, WELLCAMP container house     2021-11-18
The container office is similar to the construction of a building. The surroundings and the foundation of the partition wall are leveled, and reinforced concrete is used to be relatively strong. Then erect the pillars and connect the frame with transverse beams, top partitions, exterior wall panels, and door and window frames; then lay the floor, and then install a layer, then top the roof truss and roof panel; install doors and windows, etc., and pull the vertical supports. There are sanitary ware, small hardware and the like. Construction requirements 1. Gray line stakeout: Measure according to the location of the floor plan of the living area. 1) Residential container components The installation position of each component should meet the design requirements, and the location of the on-site welding parts should be accurate, and there should be no false welding or missing welding. 2) Fasteners a. Fasteners should meet the requirements of GB5782. b. The bolts should be installed in the correct position and gaskets should be installed according to the design requirements. There should be no missing or missing installation. C. The connecting bolts between the components should be tightened. 3) Paint a. The place where the primer peels off during on-site welding and transportation should be painted with a layer of anti-rust paint. b. The exposed parts of the components should be painted with a second layer of top paint. The paint shall not have the phenomenon of missing brushing, peeling, hanging paint and returning rust. 4) Wall a. Correct the container office and wall according to the layout plan. The corners and external corners of the umbrella wall are sealed with angle aluminum. The connection between the plates and the plates is made of I-shaped aluminum, and the walls must be vertical. The caulking depth should be the same, neat and clean, the wall should be clean, the color should be the same, the board seam should be neat, the nailing surface should be consistent up and down, and there should be no misalignment, and the necessary parts should use self-tapping bolts. b. Mark the position of the doors and windows of the container conference room according to the design drawings, cut out the position of the door and window holes with a cutting machine, install the windows and doors according to the position of the door and window holes, the windows are plastic-steel windows, and the container mobile room leases the bottom of the ceiling.
Custom message
Chat Online
Chat Online
Leave Your Message inputting...
Sign in with: